image

System introduction

Construction and development activities are inevitable in every society and its level is directly related to the social and economic situation of the society. Waste management (caused by destruction, construction) due to the high volume of production and potential of pollution, is an integral part of municipal waste management.
To  construction and waste management, plan, organize, maintain and execute operations related to the production, collection, storage, separation, transportation, recycling, processing, disposal, education and information in cities and their privacy , municipalities should be in line with their tasks under the Waste Management Law - the 2004 Parliamentary Assembly and the Administrative Code approved by the Cabinet of Ministers and the communique of the Ministry of the Interior, which communicates to all units the subsidiary has been notified. 
Based on the standards and requirements presented in this documentation, the HICO Engineering Company has implemented mechanized and intelligent building and construction management processes and integrated three integrated modules including the Windows version, the web version, the Android version of the application version and the web-based module management Soil and construction waste and construction, together with the ability to communicate with all the hardware required to implement this plan and provide all the services needed to maintain the principle of integrity in the software available in the waste management organization of the intermediary in this project.

 

The purpose of the establishment mechanized system

     Creation of an up-to-date database of vehicles and contractors, member and non-members
    Communicating with software system of municipalities in different sectors, such as system introduction , in municipalities in order to know waste production in elementary stages
     Homogenization of waste management processes in this part according to established rules
     Use of legal authority of waste organizations in this section
     Establishing a framework for cooperation between communicators and clients with the waste organization in view of creating different accessions from existing information.
     easy access to contractors and building owners to obtain licenses
     easy access to citizens , public and private organizations for the use of high quality soil
     contractors awareness about the ongoing licenses and the status of their other permits
     drivers  awareness of their vehicle  membership status 
     impossibility of extending the contractor's license by himself without  visiting the organization
     Creation of a mechanized system for transportation of construction waste and waste disposal vehicles to evacuation sites
     Removing or decreasing  human intervention 
     Removing or decreasing human error in confirming or refusing to auto-check sites
     Removing or dimming human error in confirming or refusing to auto-check sites
     system  establishment of fines for offender contractors  or offender cars or property violation
     Integration the information of the municipalities with the waste management organization
     Establishment of an integrated system for monitoring, notification of licenses or issuing offenses
     Establishment an integrated system for inspecting of violations
     Various , complete  and  rapid reporting of different types of application for organization managers 
     regulatory, legal and financial management of construction waste
     Control and organization of permitted drainage locations
     Manage and oversee the workflow of processes in the organization
     Establishing a communication and launching an intelligent fleet management system including hardware and software
     Preventation of violations in excavation operations, transportation and disposal of wastes
 

Mechanized system usage Advantages

Creating a comprehensive database of contractors and cars
Control and guidance of the system with different attitudes but while maintaining integrity
paying off Internet intra-system crimes licensing of contractors and owners activity
The system for reporting and analyzing data and the possibility of obtaining dynamic parametric reports
Easy control and monitoring of patrol and control officers
Recording reports and online track offenses using portable devices like mobile
Allocation of authorized drainage points, based on contract to qualified contractors
Requirement of contractors and their member vehicles to comply with the rules and provisions of the contract at waste disposal sites.
Exchange of two-way information between the central system and the systems
Useage of SQL Server Service Analysis to report on time saving
Responsivation of user interface that fits every screen
Securation of users' login securely using Captcha technology.
Ability to determine the termination of the waste process and the verification of the operation and the issuance of the correctness of the operation
fast data entry
Secure connection to the bank's port for paymenting financial licenses and membership fees or offenses by users
Integration of vehicle information, drivers, contractors and contracts
Management of access, support and data storage for a long time
Identification of the right and easy access of offenders in preventing and dealing with them
preventaion of violations at each stage of excavation, transportation and disposal of wastes
 Monitoring discharge sites using installed RFID tags or plaque cameras
Presentation of monitoring at source and at destination and receiving reports

 

Project implementation Necessity (problems and Expression)

    Lack of up-to-date database of vehicles and contractors of member and non-members
    Lack of awareness of construction waste production from the initial stage of operation
    Unaware of the powers that the law has left to the personnel of the waste organization.
    Unaware of the very useful rules mentioned in the above.
    Unable to classify organization information according to access levels
   The dispersion of information from waste management organizations, including member vehicles, non-automotive organizations, contractors, drivers, and their contracts.
    Lack of easy access to contractors and building owners to obtain permits
    Lack of easy access to citizens and public and private organizations for the application of good soil
    Unavailability of contractors from current licenses and the status of other licenses
    Unaware of vehicle drivers from their membership status
    impossibility of extending the contractor's license by himself without  visiting the organization
    Non-mechanized system for the transportation of waste and construction waste to evacuation sites
    The existence of human resource interference for the practical application of affairs
    The existence of human error in the approval or refusal of the vehicle to the sites
    Lack of incentive system for regulated contractors
    Lack of fines for contractors and infringing cars or infringing property
    Lack of integrity in the information of the municipalities with the waste management organization
    Lack of an integrated system for monitoring, notification of licenses or issuing offenses
    The lack of an integrated system for inspectors to record offenses
    The impossibility of diverse, complete, fast reporting of various types of application for managers of the organization